Commercial DC Fast Chargers from 20 kW to 480 kW

LONTEN’s listed DC charging portfolio spans power categories from 20 kW to 480 kW for project discussion. Choosing a charger requires more than selecting the highest power. Fleet dwell time, vehicle voltage, daily energy demand, grid capacity, transformer size, connector mix, software, payment and service access all affect the final configuration. Model availability and every feature must be confirmed for the destination market.

Solutions

We are more than just an equipment manufacturer; we are dedicated to providing specialized end-to-end solutions for EPC contractors, industrial developers, and public infrastructure projects.

Custom Transformer Engineering

Delivering bespoke designs tailored to specific voltage requirements, extreme climate resilience (for African grids), and high-efficiency industrial upgrades (for the North American market).

Charging Infrastructure Solutions

Providing comprehensive turnkey solutions for charging station construction, deeply integrating highly reliable transformers with intelligent power distribution systems to empower the future of mobility.

Residential Energy Storage Solutions

Combining LiFePO4 batteries, single-phase solar inverters, and integrated backup systems for household solar self-consumption and resilient home power.

Industrial, Commercial, and Infrastructure Hubs

Providing robust power distribution architectures for manufacturing plants, mining operations, and modern urban infrastructure.

Select power from the operating scenario

A fleet depot with overnight parking, a fuel station, a taxi hub and a highway corridor have different charging patterns. Estimate vehicles per day, battery size, arrival state of charge, target dwell time, simultaneous sessions and future expansion. A lower-power distributed layout may suit some fleets, while higher-power dispensers may suit short-stop sites. The power schedule should be tested against the actual vehicle mix and site demand.

Confirm output and connector compatibility

Provide the vehicle voltage window, maximum current, connector standard and number of charging outputs. CCS2, GB/T, CHAdeMO or other interfaces should be listed only where the selected model and destination configuration are documented. For dual-output equipment, clarify whether power is shared or independently allocated. Cable length, cable management and accessibility should also be included in the site specification.

Check grid and transformer capacity

The charger load must be coordinated with the available utility supply, transformer, switchgear, protection, cable route and demand-management strategy. Provide the site voltage, fault level where available, existing maximum demand and planned number of chargers. Weak-grid or constrained sites may require staged deployment, dynamic load management or an energy-storage study. These options should be evaluated by the project’s qualified electrical team.

Define backend, OCPP and payment

OCPP availability depends on the selected model, firmware and CSMS. State the required OCPP version, authentication method, tariff logic, local payment channels, networking, remote diagnostics, OTA policy and reporting. Request model- and firmware-specific interoperability evidence or certification where required. Payment and backend functions must also be checked for the target country.

Design for the environment and service

High ambient temperature, dust, rain, coastal exposure, altitude and local service capability can affect equipment selection and site layout. Ask for the model-specific IP and IK ratings, cooling method, operating range, noise, maintenance access and spare-parts plan. Shelter, drainage, bollards, lighting, signage and cable protection should be addressed in the civil and electrical design.

Review safety and certification documents

Certification and standard coverage vary by charger model and destination. Request the exact certificate or report number, covered models, standard edition, directives and validity. Existing CE-related evidence must not be extended to unlisted models or treated as proof of OCPP, connector, payment or backend functionality. Installation approval remains subject to local authorities and the project design.

Send a DC charging project brief

Provide site country, application, vehicle list, sessions per day, target dwell time, power level, site supply, transformer data, connector mix, number of outputs, OCPP/CSMS, payment, networking, environment, certification needs, installation schedule and quantity. LONTEN can use this brief to identify suitable models for document review and list the remaining technical questions.

Related Resources

Frequently Asked Questions

Base the decision on vehicle voltage, battery size, dwell time, simultaneous sessions, daily energy demand, grid capacity and expansion plans. Nameplate power alone does not determine real charging time.

Connector availability varies by model and destination. Submit the required CCS2, GB/T, CHAdeMO or other interface and request the model-specific connector matrix.

OCPP availability depends on the selected model, firmware and CSMS. Request version-specific interoperability evidence before specification.

That depends on the selected architecture and power-sharing logic. Confirm the number of outputs, simultaneous operation and allocation rules in the model datasheet.

Provide vehicles, traffic, target power, site supply, transformer, connectors, backend, payment, environment, civil layout, certification requirements, quantity and destination.

Project Support

Need help selecting a transformer, EV charging system, or residential energy storage solution?

Our engineering team can match the right configuration to your operating environment, charging demand, safety requirements, and household energy goals.