EV Charging Systems for Commercial and Public Projects

EV charging projects begin with users, vehicles, parking time and available electrical capacity. LONTEN’s main EV charging page helps distributors, EPCs, charge-point operators, fleets, hotels, workplaces and fuel-station developers compare AC and DC categories and prepare a project brief. Detailed power, connector and software claims belong on the relevant product or subcategory page after model verification.

Solutions

We are more than just an equipment manufacturer; we are dedicated to providing specialized end-to-end solutions for EPC contractors, industrial developers, and public infrastructure projects.

Custom Transformer Engineering

Delivering bespoke designs tailored to specific voltage requirements, extreme climate resilience (for African grids), and high-efficiency industrial upgrades (for the North American market).

Charging Infrastructure Solutions

Providing comprehensive turnkey solutions for charging station construction, deeply integrating highly reliable transformers with intelligent power distribution systems to empower the future of mobility.

Residential Energy Storage Solutions

Combining LiFePO4 batteries, single-phase solar inverters, and integrated backup systems for household solar self-consumption and resilient home power.

Industrial, Commercial, and Infrastructure Hubs

Providing robust power distribution architectures for manufacturing plants, mining operations, and modern urban infrastructure.

Choose AC or DC by dwell time

AC charging generally suits homes, apartments, hotels, workplaces and other locations where vehicles remain parked longer. DC charging is evaluated for fleets, fuel stations, taxi operations, public charging and short-stop sites. The correct choice depends on daily energy demand, parking duration, vehicle capability, turnover, grid capacity and investment plan. Many networks use both types for different user journeys.

Build the site scenario

Define who will charge, how many vehicles arrive, when demand peaks, how long vehicles stay and whether access is private, semi-public or public. Include parking layout, traffic flow, accessibility, expansion space and operating responsibility. This scenario determines the number of charge points, power allocation, authentication, payment and service model more reliably than a simple charger-count target.

Confirm the destination-market interface

Connector standards, cable arrangements, vehicle compatibility, payment methods and installation requirements vary across Ethiopia and Southeast Asian markets. State the country, vehicle mix and preferred interface at the start. Do not assume that one global configuration is appropriate. The selected model, connector, metering and payment solution must be checked against local project and approval requirements.

Plan software and operations

The project brief should define user authentication, CSMS, OCPP version, tariffs, payment, networking, remote monitoring, fault handling, reporting and OTA policy. These functions may vary by model and firmware. Distributors and operators should request a feature matrix and interoperability evidence rather than relying on broad “smart charger” language.

Size the electrical infrastructure

Review the utility connection, transformer, switchgear, cables, earthing, protection, peak demand and future chargers. Large DC sites may need a dedicated transformer or staged capacity plan; AC sites may benefit from load balancing. Where the grid is constrained, the project engineer can study demand control or storage, but such functions should not be promised until the system design and compatible equipment are confirmed.

Define installation and service scope

Clarify who is responsible for design, permits, civil work, electrical installation, commissioning, network setup, training, warranty, spare parts and ongoing support. Provide the country and site schedule so the commercial response can distinguish equipment supply from optional services. Any local approvals or certifications must be confirmed for the selected model and project.

Submit an EV charging project brief

Send the country, site type, vehicle mix, parking time, sessions per day, AC/DC preference, power supply, connector, authentication, OCPP/CSMS, payment, networking, environment, quantity, installation responsibility and target schedule. LONTEN can then route the enquiry to AC or DC model review and identify missing inputs.

Related Resources

Frequently Asked Questions

Use dwell time, daily energy demand, vehicle compatibility, site turnover and grid capacity. Long-stay locations often use AC, while short-stop or high-throughput sites evaluate DC.

Provide country, site, vehicles, traffic, dwell time, available power, connector, software, payment, network, environment, quantity and service scope.

Not automatically. Vehicle interfaces, grid conditions, payment channels and project requirements vary. Confirm the country and model configuration before selection.

The qualified electrical designer should calculate diversified charger demand, power factor, harmonics, future growth and other site loads, then coordinate the transformer and protection. Provide this study with the RFQ when available.

They vary by model, firmware and project. State the required CSMS, OCPP version, authentication and payment method and request model-specific evidence.